SERVICES - CONSTRUCTION

IJM FasTrak - The express building process

  • IJM FasTrak is a unique construction system developed through many years of experience.

  • Wall and floor panels are configured by our design team to match your design drawings and also to best suit the efficient erection of your home.

  • The speed of erection within the FasTrack process can only be achieved by the high priority placed on research and development at IJM TimberFrame and the practical experiences which have been gained since 1965.

  • Our adherence to quality, manufacture and construction of the highest standards is complimented further by the FasTrack process.

Construction Sequence

Standard Masonry Construction

Weeks

IJM FasTrack

Foundations

1

Foundations

Foundations

2

Foundations

Bricklayer ground floor

3

Erect timber frame structure, fix & glaze windows

Bricklayer

4

Felt, battens, tile roof

Fix & glaze windows

5

Brickwork & first fix

.

6

.

Roof structure

7

Insulate

Felt, battens, tile roof

8

Dry line

First fix

9

Second fix

Plasterwork

10

Decorate and move in

Plasterwork

11

 

Average building time can be substantially reduced using IJM FasTrak system with significant reductions of on site labour.

.

12

Second fix, plumber, electrician

13

.

14

.

15

.

16

.

17

Second fix, carpenter

18

...

19

Decorate, move in

20

 

      Providing comprehensive Timber Frame packages to Self Builders, Builders, Contractors and solutions through partnering with Architectural & Engineering Professions all over Ireland & the U.K. to include N. Ireland, England, Scotland & Wales.